|
ITEC 720: Field Study at the Exploratorium Check-In Week 17 |
|
For 5/21/2009:
- Will complete count the bounces with Paul and Ray, assuming monitor comes in. Will contact MedeaWiz about serial port polling latency.
- Start wiki trainings?
For 5/20/2009:
- Researched Arduino Mega / firmata pairing, as we need 15 pins available for the abstract image exhibit; we have 14, because 0 and 1 and serial send and receive for firmata. The new Arduino mega will run firmata, but for the moment will still only address 16 total, according to the header file: http://www.arduino.cc/cgi-bin/yabb2/YaBB.pl?num=1238768997. I'll talk to Ray about this. Perhaps the pin 1 (send) can alternate between a light button and send control. This project just gets more complicated. I like it!
For 5/19/2009:
For 5/18/2009:
For 5/14/2009:
For 5/13/2009:
For 5/12/2009:
- Checked with Ray on CTB monitor, has not arrived. Ray will track it.
- Finished Inkblot physical prototype, tested buttons. Next, AS3/Glue input events. Will they fire correctly???
|
|